Opening The Door to Better Cubicles
7 Top Tips on how to build your cubicle
| Follow these steps to install your cubicle as supplied by UK Cubicles. Just follow these easy to understand instructions.
Print off the page if you need to. Make sure your lines are vertical as you have areas like floors or walls which can be out of true.
|
| |
| Step 1 Measuring up |
| |
| Measure and mark off a vertical line on the back wall for the positions of the wall partitions for the
cubicles. Mark on the wall the positions to fix the three back wall brackets. |
| |
| Step 2 Fitting Brackets |
| |
| Fix the 3 back wall channel brackets as required for each partition on the vertical line drawn on the wall. |
| |
| Step 3 Fitting Partitions |
| |
| Position the wall panels into the brackets and ensure the partition is level using the adjustable legs fixed to the wall panels. Draw the exact position of the holes in the channel brackets on the walls of each partition ready for drilling. Drill the hole using a 10mm drill bit and fix the brackets to the partition walls using the T-nuts provided. |
| |
| Step 4 Fitting Partition Support |
| |
| Check the attached the adjustable leg to the partition, and adjust to correct height. Ensure the partition is aligned correctly and fix adjustable legs to the floor. |
| |
| Step 5 Fitting Fascia Panels |
| |
| Measure up and mark off a vertical line on the side wall if fixing to a wall. Fix the 3 wall brackets the wall. Make sure the hinge panel is level and mark off the positions of the 3 brackets on the fascia. Fix the hinge wall to fascia channel brackets using the T-nuts provided.
Your pilaster (central fascia panel) will have the hinge holes predrilled and simply fix those using the T-nuts provided. |
| |
| Step 6 Fitting
Head Rail |
| |
| With the partitions and fascia fixed the head rail must be placed in position over the tops of the fascia bridging the door gap. Fix the head rail permanently by attaching to the fascia. |
| |
| Step 7 Fitting the doors, hinges and lock assembly |
| |
| Attach the hinges to the doors. Attach the indictor bolt to the door. Block the doors up to the level of the hinge panel bottom using wood and
place the door on the blocks. Engage the lock and mark off the indicator bolt on the fascia at the point you want to attach the keep. Mark off the hinge placement on the hinge panel. To drill the hinge holes remove the nut at the bottom of the hinge and reassemble and attach the hinges to the walls ensuring the door is hung horizontal.
Unlock the indicator bolt and attach the keep using the fixings provided.
Set back the plastic sleeves inside the hinge for the door to close closed or open. |
|
A Cubicle layout with measurements and tolerances you need to consider. |
UK Cubicles - Opening the Door to Better Cubicles
Great ranges of Laboratory Furniture at Mark Finn Laboratory Installations where you will find everything for your laboratory with design, manufacture and installation needs supplied. Copyright: UK Cubicles 2009 |